|
||||||||
Full roundabout junction with spur road to airport terminals. The next section to J16 was opened in September 1985 at a cost of £69.8m. It is built between two reservoirs and there are steep reservoir embankments either side of the motorway. Watch out for low flying aircraft on final approach to Heathrow!